WOW we are CLOSE!!!
Carpet gets laid the 7th then we clean on the 13th!!!
MOVE IN ON THE 18th!!!!
Can't wait - it has been a L O N G haul. We have known for our entire marriage we were going to build out there before our first child entered Kind. So since the day Jaren was born we knew when we would be moving. So close we can taste it - just have a lot more boxes to pack to be ready.
tub faucet goes in |
Hard woods start being laid |
doors on kids bathroom vanity |
the two small (dirtiest) cabnit doors go in. I don't know why, but I have been dying for those to go in. I think just because it gives it a more finished look. Even without the oven and fridge |
more hardwoods |
propane tank is in |
one shower head gets installed |
They UNCOVERED the island. Since the day after we got counter tops the island has been covered with protective paper. It feels good to have it unwrapped |
both faucets in master bath |
second shower head in master bath |
hood vent is installed |
gutters |
our first appliance - the dishwasher was put in!!! |